From Idea to Production in 90 Days
Most founders overestimate the time it takes to launch and underestimate what's already solved by the ecosystem. In this piece we break down the exact 90-day loop we run: discovery, foundation, ship, iterate.
Week 1 — Problem framing
Before any line of code, we pin down the single metric that will tell us the product works. Everything else flexes.
Week 2–6 — Foundation & vertical slice
Auth, deploy pipeline, observability, and the thinnest possible end-to-end slice through the core use case.
Week 7–12 — Compound iteration
Two-week cadence, instrumented from day one. We measure activation and time-to-value, and cut features that don't move either.
More from the blog
OWASP Top 10: A Practical Defense Checklist
Every modern stack ships with half of these mitigations for free — if you configure them. Here's the short list we enforce on every production project.
Bridging PLCs and the Cloud with MQTT
Legacy factory floors and modern analytics platforms don't have to live on different planets. A lightweight MQTT broker is often the only piece missing.